Politiparty
Politiparty

119th Congress Energy

H.R. 9084: Department of Energy Nuclear Transparency Act

ReportedNov 5, 2026

  1. Introduced (completed)Jun 2, 2026
  2. Passed House (not reached)
  3. Passed Senate (not reached)
  4. To the President (not reached)
  5. Became law (not reached)

Summary

Introduced in House, Jun 2, 2026

The following analysis is based on draft bill text that was made available by the House of Representatives and may differ from the bill text as introduced.

Department of Energy Nuclear Transparency Act

This bill directs the Department of Energy (DOE) to report actions related to its authorization of DOE nuclear facilities and other related DOE actions on a public website within 72 hours of those authorizations or actions occurring.

Read the full summary

Specifically, DOE must post information about agreements to authorize nuclear facilities that fall under Hazard Category 1, 2, or 3. Hazard categories are based on the radioactive material inventories of the facilities and the potential consequences to the public, workers, and the environment. Hazard Category 1 represents the highest potential consequence.

DOE must also post a summary of any actions it took to alter a directive or safety standard relating to such facilities.

Further, DOE must post any preliminary documented safety analysis or documented safety analysis that it issues for such facilities. A preliminary documented safety analysis means documentation prepared in connection with the design and construction of a new Hazard Category 1, 2, or 3 DOE nuclear facility or a major modification to such nuclear facility already in existence that provides a reasonable basis for the preliminary conclusion that the nuclear facility can be operated safely through the consideration of certain factors. A documented safety analysis means a documented analysis of the extent to which a nuclear facility can be operated safely with respect to workers, the public, and the environment.

DOE must also issue an annual report detailing any activities it took to authorize such DOE nuclear facilities during the previous year.

Written by the Congressional Research Service, Library of Congress.

Roll calls

0 votes on this bill

No roll call votes have been held on this bill.

Amendments

0 offered

No amendments were offered to this bill.

Cosponsors

1

Bipartisan support.

Who scored on this bill

26 points earned
  1. 1Kathy Castor D-FL SponsorIntroduced, drew cross-party cosponsors, reported3 events+26
See all scorers and every scoring event

Introductions and cosponsorships count toward weekly caps and show no points.

Other bills by Kathy Castor

History

  1. Jun 2, 2026Introduced in the House by Kathy Castor.
Show the full action history (7 actions)
  1. Nov 5, 2026Reported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-874.
  2. Nov 5, 2026Placed on the Union Calendar, Calendar No. 771.
  3. Jul 14, 2026Subcommittee Consideration and Mark-up Session Held
  4. Jul 14, 2026Forwarded by Subcommittee to Full Committee by Voice Vote.
  5. Jun 2, 2026Referred to the Subcommittee on Energy.
  6. Jun 2, 2026Introduced in House
  7. Jun 2, 2026Referred to the House Committee on Energy and Commerce.